Only mention project-specific requirements if they exist

XMLWordPrintable

    • Type: Bug
    • Resolution: Duplicate
    • Priority: P4
    • None
    • Affects Version/s: None
    • Component/s: bots
    • None

      After a PR passes all automated pre-integration checks, a link to project specific requirements is posted. This link should only be added if the project actually contains such requirements (a CONTRIBUTING.md file),

            Assignee:
            Unassigned
            Reporter:
            Robin Westberg (Inactive)
            Votes:
            0 Vote for this issue
            Watchers:
            1 Start watching this issue

              Created:
              Updated:
              Resolved: